Over this week, I've emptied a few boxes. Not easy, considering I have very little storage space. I'm waiting for the kitchen to go in before tackling the next job.
The skip was filled and replaced, and yesterday I managed to get heaps in there. I do need to wait for Rob to squash it down though, as I'm not really heavy enough to make an impact (and am kind of afraid I'll get stuck in it lol, as it is quite big).
I ordered my appliances on Thursday.
Built in oven
http://www.emiliaappliances.com.au/EmiliaProducts/EF6FIDG60cmBuiltinelectricoven.aspx
Cooktop with wok burner
http://www.emiliaappliances.com.au/EmiliaProducts/SEC64GWI60cmGascooktopwithwokburner.aspx
Dishwasher (I think it is this one)
http://www.fisherpaykel.com.au/product/dishwashing/dishwashing/index.cfm?productuid=2262F15F-F1CF-4767-B60D45AC2ECE4EC2
The colours of my kitchen are white doors (so the appliances will be white where possible), stipple aquatic for the bench tops and olympia red for the drawer fronts and the kickboards.
http://www.laminex.com.au/controls/products/swatch.aspx?id=870&name=Stipple%20Aquatic&bxsid=14448
http://www.laminex.com.au/controls/products/swatch.aspx?id=746&name=Olympia%20Red&bxsid=14393
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment